Be sure to rake some of that dirt down away from the foundation. You want 4-6" minimum from the bottom of the brick to top of the sod, if possible
Sent from my SAMSUNG-SM-G930A using Tapatalk
Sent from my SAMSUNG-SM-G930A using Tapatalk
to the soil then the sod. I also made sure to wet the soil and the underside of the sod.
Comment